Kramer Schalltechnik GmbH

Noise Reduction Plans

Noise Reduction Plans

  • As a preliminary step to the noise reduction plan required under Section 47a of the Federal Immission Control Act (BImSchG), a cost-effective pre-screening can be carried out to narrow down the areas requiring detailed investigation.
  • Preparation of noise immission maps for the various noise types using state-of-the-art software systems.
  • Identification of conflict areas and establishment of a priority list taking into account the number of people affected.
  • Consultation on the development and implementation of noise reduction measures.